WRIGHT J-5 Part 2

Outside turning of the casting. Crank case.
Inside turning of the casting
Deckel optical rotary table. Marking out cylinders and valve lifters.
Pump centre for exact alignment
Finished crankcase (except for the bolting holes for the cylinder)
Front cover, crank case and compressor housing.
Copressor side.
Planetary gear housing.
18 BA6 screws. Tap drill 2.3 mm.
Gear box
Gear box

Skriv en kommentar: (Klikk her)

123hjemmeside.no
Antall tegn tilbake: 160
OK Sender...
Se alle kommentarer

| Svar

Nyeste kommentarer

08.02 | 06:36

Dear Sir
My son manged to get his hands on Schaublin 135. He requires a wiring diagram that is not cut off like on many of the online manuals.

...
06.02 | 18:48

That is beautiful. Awesome motor. I love the usage of a lot of brass too. Im sure you are an excellent surgeon too.

...
09.12 | 00:26

I have also owned a 135 for almost 25 years they are a superbly built machine, I am now semi retired and hopefully will overhaul the 135 also.

...
05.11 | 10:32

Good morning, this shaublin 70 is for sale ?

...
Du liker denne siden